Why we are expensive

Straight talk about price

Why we are expensive

The full cycle at stroydom.ge costs 1,250–1,550 GEL/m², a shell 500–700 GEL/m², ready for finishing 850–1,100 GEL/m². That price includes what a cheap estimate strikes out: engineering before construction at 3–5% of the budget, a site manager and engineering control at each stage, design-grade materials, time for concrete to gain strength, and a warranty of up to 10 years under the handover certificate.

Clients regularly send us estimates where the same house costs a third less. We do not argue with the number; we show what it leaves out. The gap almost always comes down to one of four things: work simply missing from the estimate, materials of a lower class, nobody on the crew accountable for method, or stages run in the wrong order. None of it is visible when you sign, but all of it is visible by year three.

Where exactly is the cheapness hidden in an estimate?

We finish other contractors' projects often enough to know the list by heart. It is short and it repeats with almost no variation.

What is the stroydom.ge price made of?

What is the stroydom.ge price made of?
ItemWhat is included and the price
Engineering before constructionSite geology, structural calculation for seismic loads, working documentation. Around 3–5% of the budget that removes most of the risk, and the first thing struck out of a cheap estimate.
People who check the workA site manager, stage-by-stage engineering supervision, and a procurement lead who verifies material batches. A separate cost line that many contractors simply never budget for.
Materials to the specified classConcrete at the calculated grade, rebar at the drawn section, waterproofing in the specified number of layers. We do not substitute something similar and cheaper. Where a saving is possible, we raise it with you and put it in the design.
Time for the method to workConcrete gains strength for as long as it needs to. The next stage does not begin until the previous one has been accepted. Sometimes slower, always cheaper than rebuilding.
A warranty that is backedUp to 10 years from handover. A warranty only means something when the company knows exactly what it built and can evidence it.

Engineering before construction

Site geology, structural calculation for seismic loads, working documentation. Around 3–5% of the budget that removes most of the risk, and the first thing struck out of a cheap estimate.

People who check the work

A site manager, stage-by-stage engineering supervision, and a procurement lead who verifies material batches. A separate cost line that many contractors simply never budget for.

Materials to the specified class

Concrete at the calculated grade, rebar at the drawn section, waterproofing in the specified number of layers. We do not substitute something similar and cheaper. Where a saving is possible, we raise it with you and put it in the design.

Time for the method to work

Concrete gains strength for as long as it needs to. The next stage does not begin until the previous one has been accepted. Sometimes slower, always cheaper than rebuilding.

A warranty that is backed

Up to 10 years from handover. A warranty only means something when the company knows exactly what it built and can evidence it.

Updated:

Send us another contractor's estimate for review

We will look for missing stages, understated quantities and the line items that typically come back as a variation order. No obligation: even if you build with someone else, you will know what the job really costs.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Common questions about price

How much more expensive are you than the market average?

The fair comparison is not the bottom line but the scope behind it. When we bring another estimate up to our scope (adding the missing items, raising materials to the specified class, including supervision), the gap usually narrows from 30–40% to 5–15%. What remains is engineering, supervision and warranty.

Is there anything you can make cheaper?

Yes, but not the structure or the concealed work. Real savings come from the floor area and shape of the house, the number of storeys, the class of finishes and equipment, and the order of works. All of it is discussed at design stage, written into the documentation, and never turns into a surprise on site.

Can you just refurbish an apartment?

Yes, as a standalone order from 1,000 GEL. Our main product is still the whole house, and our control system (design, acceptance acts, supervision, warranty) is built around that format. Apart from building houses, we sell supervision of other contractors' sites and take corporate contracts.

Why only concrete frame and block?

Because in seismically active Georgia this is a structure with predictable behaviour: it is calculated, reinforced to that calculation and works as a single system. We do not build timber-frame or modular houses. They are not bad, but we are not prepared to stand behind work in which we have no deep practice of our own.

Can the estimate really not grow?

The estimate is fixed by contract and changes only through variations you have agreed in writing yourself: a different finish, an added room, a design change. Work we failed to account for through our own error is our responsibility, not a reason to ask you for more.